BICS applications close 30 November — check your eligibility.
Up to 25% off eligible electricity, backdated to April 2026. We confirm your band, build the evidence pack, and handle the submission.
- ✦Confirm your band — check your SIC + HS codes against the government’s eligible lists.
- ✦Build the evidence pack — metering, MPAN attribution, site-mix proof.
- ✦We handle the submission — within the 1 Oct – 30 Nov window.
What BICS application support involves
The Year 1 BICS window is time-limited and evidence-heavy. Getting it right means resolving your eligibility, assembling the evidence DBT will accept, and submitting inside the 1 October – 30 November 2026 window. ENERGYbubble handles all three:
- Confirm your band. We resolve the SIC + HS AND-rule for your actual activity and products against the government’s eligible lists, and assess your site mix against the 25% floor.
- Build the evidence pack. We map which MPANs sit at each site and evidence the proportion of electricity used for eligible manufacturing — the work that defends the highest supportable band.
- Handle the submission. We assemble and submit the pack in the form DBT expects, inside the window, so nothing is left to the deadline.
Do I need a consultant to apply for BICS?
You can approach BICS yourself — but the application turns on classification and evidence, and small errors in SIC/HS resolution or metering attribution translate directly into a lower band or a rejection. Because we already sit across procurement and metering data, we start from your real consumption rather than a blank form, and we defend the highest band your evidence supports. For a mixed or multi-site manufacturer, that difference is usually worth far more than the cost of support.
Common questions
How much does BICS application support cost? +
Can you handle multi-site applications? +
When should I start? +
What if I’m not sure we’re eligible? +
Ready to secure your band before 30 November?
Check eligibility now, or book a call with a BICS specialist.
